On Orlando Avenue, the town of Wellington is sporting a new bridge that replaces a 1920 mode. Radtke Contractors of Winneconne, Wis., began the project April 13 and finished May 27. The total cost was 256,500, which was paid for with township, county and state funds.
New bridge in Wellington